Railway Viaduct over River Morar, Falls of Morar, Morar
River Morar; Cnoc Drochaid; Morar Viaduct
Year built :
1897
Designer/builder :
(Simpson & Wilson)
Length :
? + 15,2 + 28 + 15,2 m
Current use :
railway
Over :
River Morar
Type :
arch
Material :
concrete
Grid Reference.:
NM 6813 9223
Comments :
High 3-span concrete bridge; concrete rusticated detailing to three differing width arch rings; concrete parapet. [HER] It seems to be one of the first concrete bridges. The bridge has a forth arch in the south-wingwall. The arch over the road is 9,7 m high.